Advanced Factories

Advanced Technology Buildings for Wexford County Council in New Ross consisting of Office and Light Industrial / Production areas. The Advance Technology Building is an IDA-developed, flexible building typology designed to accommodate a range of potential occupiers, including light industry, manufacturing, and research and development. As no specific end user is identified at design stage, […]
Becton Dickenson Alpha Cleanroom

MEDICAL DEVICE MANUFACTURING FACILITIES, BECTON DICKENSON / C.R. BARD This project involved the front-end design, construction management and project supervision of a Grade D (ISO Class 8) Cleanroom for a large multi-national medical device company in Enniscorthy, Co. Wexford. O’Leary Sludds architects managed and coordinated the full design team which included the services provided by […]
Arc Office Fitout

OLS Architects delivered a contemporary workplace fitout for a well-known insurance company, transforming the office into a modern, flexible environment that supports collaboration, focus, and staff wellbeing. The design balances a strong corporate identity with a warm, human-centred approach. Open-plan work areas are arranged to maximise natural light and visual connectivity, while carefully positioned glazed […]
Enterprise Centre Wexford

OLS Architects were appointed to deliver a comprehensive refurbishment of the Wexford Enterprise Centre, comprising an external facelift alongside a full internal fitout of the reception area, offices, café, and shared workspaces. The external works modernised the building’s presence, introducing a clean, contemporary façade that reinforces the Centre’s identity as a professional and welcoming hub […]
Oyster Lane

Concept Design – Former Dun Mhuire Theatre Site This conceptual proposal for a new Music and Community Theatre in Wexford Town reimagines the historic Dun Mhuire Theatre site as a vibrant cultural anchor for the town and wider region. The design seeks to celebrate Wexford’s rich artistic tradition while providing a contemporary, flexible venue that […]
Becton Dickenson Beta Cleanroom

MEDICAL DEVICE MANUFACTURING FACILITIES, BECTON DICKENSON / C.R. BARD This project involved the front end design, construction management and project supervision of a Grade D (ISO Class 8) Cleanroom for an indigenous medical device company in Enniscorthy, Co. Wexford. In order to fit the new cleanrooms within the existing facility an enabling works contract involving […]
Bard Fitout

OFFICE FIT-OUT, C.R. BARD This project is a commercial interior office fit-out for a large medical device company in Enniscorthy, Co. Wexford. The floor to ceiling height within the existing building was particularly challenging given the size of the room and the need to maximise the floor to ceiling height. We set out to break […]